Tired of explaining late curtains to your customer?

What a supplier might tell you, crossed out: “It’s been pushed back another week.”

What we say instead: Know what moves a date before you promise one.

At Speedy Blinds every estimate is written down and counted from the later of your order being accepted and paid and the fabric arriving, and if your fabric goes on back order, you hear as soon as we do, then choose to switch fabric, wait, or cancel the curtains it affects.

At the dispatch bench a staff member presses a label onto a packed carton, a handheld scanner beside it and labelled curtains in clear polythene stacked on the shelves behind.

What it costs you

  • You gave your customer a date, and now you’re calling to move it.
  • The installer’s booked, the day’s blocked out, and the curtains aren’t there.
  • Nobody told you the fabric was late until you asked.

What you can be certain of

JOB SPDY-2012 · LEAD TIMES

  1. 01
    We commit to
    Estimates in writing, before you quote.
    How you’ll know
    They’re written into our tolerances, and the estimates are on our turnaround page.
  2. 02
    We commit to
    The usual date movers, named up front.
    How you’ll know
    Fabric ordered in (typically 1 to 2 weeks from the supplier), Group C (3 weeks), pre training (3 business days extra) and the peak months, late October into January.
  3. 03
    We commit to
    Word as soon as your fabric goes on back order.
    How you’ll know
    If a fabric goes on back order, we tell you as soon as we’re told.
    If something goes wrong
    You choose: switch to another fabric, wait for it, or cancel the curtains it affects.
  4. 04
    We commit to
    Stock you can check before you sell.
    How you’ll know
    Fabric Stock shows our stock, live, with no login. It can still move between when you look and when your job is cut, especially on a low roll, so call us if it’s close.
  5. 05
    We commit to
    The job’s stage where you can see it.
    How you’ll know
    Each part of the job shows its own stage in the Order app, Back Order included: see how order tracking works.

Give your customer a date you can keep

The same standard curtain job, two ways.

Fabric in stock

  1. You send the job, and it’s accepted and paid in cleared funds.
  2. The fabric’s already here, so the estimate starts then: 5 business days for standard curtains, plus 3 business days if they’re pre trained.
  3. Then allow for delivery to the address, or collect from the factory.

Fabric ordered in

  1. You send the job, and it’s accepted and paid in cleared funds.
  2. We order the fabric. Supplier delivery is typically 1 to 2 weeks, and longer in the peak months.
  3. The estimate starts when the fabric arrives: 5 business days for standard curtains, plus 3 business days if they’re pre trained.
  4. Then allow for delivery to the address, or collect from the factory.

If the date is tight, or it’s late October into January, call us before you promise it.

Key facts

Fabric ordered in
Typically 1 to 2 weeks
From the supplier; longer in peak months
Peak months
Late October into January
The clock starts
At the later of payment and fabric in
Fabric on back order
Told as soon as we’re told
Your choice on a back order
Switch fabric, wait, or cancel those curtains
Christmas orders
Usually taken later than most workrooms

Questions retailers ask

What can move my date?

The usual ones, named before you order: fabric that has to be ordered in (typically 1 to 2 weeks from the supplier, longer in the peak months), the extra time Group C and pre training take, and the industry’s peak months, late October into January, when every estimate stretches.

What if my fabric is late?

If the fabric goes on back order, we tell you as soon as we’re told. Then it’s your call: switch to another fabric, wait for it, or cancel the curtains it affects. Fabric ordered in typically takes 1 to 2 weeks from the supplier, so check stock before you promise a date.

What happens from late October?

Our estimates stretch through the industry’s peak months, late October into January, and supplier fabric can take longer too. We usually take Christmas orders later than most workrooms. We close over Christmas and New Year, and the dates go to all retailers in advance.

Will you commit to a date?

We give estimates, not delivery dates. Our trading terms say so, and we’d rather be straight about it. What doesn’t move is how the estimate is counted, and that you hear as soon as we’re told a fabric has gone on back order. If a date really matters, call us before you promise it.

Can I see where my job is up to?

Yes. Open the job in the Order app, and each part (curtain, track, roller blind) shows its own stage, from New through to Out. There’s more on how order tracking works on its own page.

Start with one job

No application, no minimum, no contract.

Send us one job and see how it comes back. Most retailers start that way.

Tell us what you sell, where you work and what you need from a workroom. We’ll tell you plainly whether we’re the right fit, and if we’re not, we’ll say that too.

Tell us about your business

Leave your details and we’ll call you back.

We’ll only use these details to talk to you about a wholesale account. Please don’t enter your own customers’ details here.

Would rather just call?

8:30am to 4:30pm, Monday to Friday